Sector: Education
Service: Building Surveying | Project Management

Holy Trinity School 

Faced with a shortage in early years pupil places in Somerset, the local authority engaged Hookway to design and project manage the construction of a new four classroom block.  A Victorian town centre school was chosen as the new build site. Having recently completed a successful new extension to create a new assembly hall at the school we were asked to provide a modern teaching block that would fit comfortably within the existing topography.

The challenge

Following our options appraisal the site of a former swimming pool opposite the main school entrance was chosen as the build site. Highly aware of effect that poor school design can have on teaching and learning the stakeholders had very firm ideas on performance requirements.

The solution

Despite the restricted site area and very close proximity to the existing school entrance the works were a great success. Although apprehensive before the start, school staff and pupils enjoyed the whole process. They were encouraged to take part in the design and kept a keen interest during construction.

The result

The design is popular with pupils and staff alike and the local authority are very pleased with the whole experience especially as time and budget constraints were not exceeded. Each classroom has easy access to covered play and the integration between internal learning and external play has been a success. Hookway still enjoys a good working relationship with the school and act as their maintenance surveyors.

“The whole project has been a complete success from start to finish. Hookway and the builders (HBC) were a pleasure to deal with and the project management was highly professional. It has been open for over a year and teachers and pupils are still excited about the new building it is so well designed in terms of light, space and ventilation that it is a joy to work in. The projecting roof at each end creates fantastic covered play space.” Nigel Bright - Head Teacher

Related case studies

Norton Hill Academy

High performance – creating a new, flexible drama space for Norton Hill Academy. A space that can also be used for multiple additional activities.

Read full case study

St Bonaventures

How value engineering and careful cost management from Hookway helped fulfill the Governors’ vision of rebuilding St Bonaventure’s school.

Read full case study

Bath & Wells MAT

Condition Surveys help Bath and Wells Multi Academy Trust plan and implement critical preventative maintenance works.

Read full case study

Testimonial

“Everyone at Hookway has been great to work with. They have worked closely with us to ensure that every last detail has been agreed and implemented. Thank you - we look forward to working with you again!”

“Hookway was instrumental in securing The Redstart Learning Partnership schools crucial Salix LCSF funding. This grant will provide us with invaluable energy appraisal surveys, which will greatly enhance our chances of being awarded PSDS capital funding for decarbonisation projects. ”

“Hookway worked in close partnership with us and carefully managed a range of trades and contractors. Greg Smith, Hookway’s Surveyor, met with my team regularly and always acted upon any feedback shared; he cared passionately about the quality of the work and made sure that it was completed to an excellent standard.’”